Resources
Case Studies
See how teams across different industries use Plotstuff to manage spatial projects more effectively.
Regional Hospital Wayfinding Overhaul
A 500-bed regional hospital needed to redesign its entire wayfinding system across 8 buildings and 12 floors. Using Plotstuff, the consulting team mapped over 2,400 sign locations, coordinated approval workflows with hospital administration, and exported production-ready artwork — reducing the project timeline from 14 months to 9.
National Retail Chain Store Roll-out
A retail chain expanding to 25 new locations needed consistent signage across all stores. Plotstuff's template system and phase-based filtering enabled the facilities team to manage the roll-out in three phases, ensuring brand consistency while accommodating local variations in store layout.
University Campus Fire Safety Audit
A large university campus required a comprehensive fire safety audit across 15 buildings. Using Plotstuff's inspection workflows, the safety team documented every fire asset location on DXF floorplans, ran structured inspections with photo evidence, and generated compliance reports for the fire authority.
Corporate HQ Facilities Management
A multinational company's new headquarters needed a complete asset register across 6 floors — from AV equipment to desk allocations. Plotstuff provided a visual source of truth for the facilities team, replacing scattered spreadsheets and enabling real-time tracking of asset locations and maintenance schedules.
Have a similar project?
We'd love to hear about your project and show you how Plotstuff can help.